Trout Unlimited - Icicle Creek Fish Passage Project - Leavenworth

Schedule A: City of Leavenworth Water Main Replacement Project Installation of approximately 1,575 LF of 16” ductile iron water pipe and electrical and control conduit, water valves, restraint, fittings and appurtenances including trench excavation, backfill compaction, furnishing, placing and compaction of pipe bedding material Construction of (2) gabion retaining walls Excavation, removal and disposal of approximately 2,000 CY of rock boulders and earth, including breaking of boulders Placement and compaction of approximately 550 CY of earth fill Furnishing, placement and compaction of approximately 2,400 SY of 6-inch thick crushed surfacing Furnishing, placement and compaction of approximately 150 SY of 2-inch thick commercial HMA pavement patching Temporary traffic control and provisions for bypass pumping during construction Temporary and permanent erosion control and water pollution control elements Schedule B: Icicle Boulder Field Passage – Step Pool Channel Construction of a rock step-pool channel for fish passage that includes, Large Boulder Breaking (Exposed and Buried) approximately 1560 CY General Rock Excavation of approximately 675 CY Removal and disposal of approximately 2235 CY of rock boulders and earth, including breaking of boulders requiring physical and chemical methods of splitting Excavating Four Pools of approximately 320 CY Construction of four Rock Steps Breaking and partial removal of Five Large Boulders in the Water Placement and removal of erosion controls and water quality monitoring An allocation for a second year project review and inspection and modifications as needed Schedule C: City of Leavenworth Fish Exclusion Project Installation of approximately 260 LF of 18 inch and 26 LF of 16-inch ductile iron water pipe water valves, restraint, fittings and appurtenances including trench excavation, backfill compaction, furnishing, placing and compaction of pipe bedding material at up to 18 feet below existing grade Excavation, removal and disposal of approximately 3,400 CY of rock boulders and earth, including breaking of boulders Demolishing and disposal of a 30 ft x 14 ft x 12 ft existing reinforced cast in place screenhouse adjacent to live water Placement of a precast concrete vault and associated pipe and valves, installation of a fish and debris exclusion screen, metal fabrication for grating and a gantry, and construction of a wood framed building and installation of associated fixtures over that vault; Stream channel work and stacking of heavy loose scour protection rock Temporary traffic control and provisions for bypass pumping during construction Temporary and permanent erosion control and water pollution control elements

Status

Accepting Bids

Prebid Date4/1/20 10:00 am

Bid Date4/15/20 2:00 pm

Company & Contacts

Varela & Associates, INC.

Jeff Moran   (509) 328-6066

Location

Leavenworth, WA

Project Estimate: $2,640,000.00

Bidders may download electronic files for a nominal fee of $15.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

04/01/20 – A mandatory site visit is scheduled for April 1, 2020 at 10 am. Submittal of a bid without attending the site visit will be considered non-responsive.