Outside Parking Lot Reconfiguration - 20-40-1984

The Work includes, but is not limited to: saw-cutting, sub-base excavation, pavement patching, pavement marking removal and replacement, seal coating, ADA ramps, signage, light pole replacement, and miscellaneous electrical work. Removing/grinding of failed pavement areas will extend full-depth (1-1/2 to 2 inches) to remove the defective material. The sub-base will be excavated and replaced with suitable material. The depth of subgrade will extend 9-inches below the asphalt surface. The subgrade will be backfilled and compacted, and 3-inch pavement patch will be placed. The entire lot will be seal coated prior to placing pavement markings. The project will be completed in two phases.

Status

Bidding Closed

Prebid Date3/23/20 10:00 am

Bid Date4/1/20 10:00 am

Company & Contacts

Spokane International Airport

Andrew Barrington - abarrington@spokaneairports.net   (509) 455-6431

Location

Spokane, WA

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A MANDATORY Pre-Bid Conference will be held in the Executive Conference Center of the Spokane International Airport at 10:00 A.M. and March 23, 2020. Major subcontractors are encouraged to attend; however, it is mandatory for Prime Contractors only. Any bid submitted by a firm, which did not attend this pre-bid conference, will be rejected.