Transit Building Electrical Upgrades

The project scope of work consists of: an upsize of the current electrical system to a 480-volt service, and the installation of two electrical bus charging stations, and the supporting electrical panel equipment and pathways. The project includes, but is not limited to the demolition, removal and disposal of the existing electrical equipment, and the procurement, installation, testing, training and commissioning of the electrical and bus charging systems, a window replacement, a gas meter relocation, and patch and repair of any and all interior and exterior surfaces adjacent to and/or damaged during the defined project scope of work.

Status

Accepting Bids

Prebid Date4/2/20 10:00 am

Bid Date4/14/20 2:00 pm

Company & Contacts

Design West Architects

Chelsea Holstad - cholstad@designwestpa.com   (509) 332-3113

Location

Pullman, WA

Project Estimate: $367,000.00

Bidders may download electronic files for a nominal fee of $10.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

Bidders are strongly encouraged to attend the Pre-Bid Conference to be held at 10:00 A.M. Thursday, April 2, 2020 at the Pullman Transit Facility, 775 Guy Street, Pullman, WA.