ESH - Eastlake: Door & Hardware Replacement

Work of the Contract can be summarized as follows: Replace various doors and hardware. Work consists of, but is not limited to, removing doors and replacing with new doors and hardware and removing some interior door/frame assemblies and providing large door/frame assemblies. Associated work consists of, but is not limited to, light gauge metal framing, gypsum board assemblies, painting, flooring, resilient base, electrical lighting (switch) relocation at doors with larger frames, and miscellaneous other work associated with replacement.

Status

Accepting Bids

Prebid Date3/5/20 10:00 am

Bid Date4/16/20 10:00 am

Company & Contacts

RGU Architecture and Planning

Robert Uhrich   (509) 758-9894

Location

Medica Lake, WA