City of Spokane Intertie & Booster Station - 2020 - ARI

The construction of a 392 s.f. C.M.U. booster station adjacent to the City’s existing well station that includes, pumps, piping, manifolds, valves, and appurtenances. Also included in the project is the installation of approximately 900 l.f. of 16” ductile iron and C-900 water main along with a 70’ bore beneath SR 902 in 24” casing. Other items of construction include a 3-vault intertie with the City of Spokane, stormwater drainage, minor site grading/excavation, fence relocation, and 70 tons of pavement surfacing.

Status

Accepting Bids

Bid Date2/27/20 2:00 pm

Company & Contacts

E&H Engineering

Thomas Haggarty enheng@msn.com   (509) 744-0245

Location

Spokane, WA

At the Owners request, Bidders may obtain the project and bid information from their plan room at ‘www.ehengineeringplans.com’

Plan Centers may download the project information from ‘www.abadandistribution.com’