WWTP Standby Generator and Influent Valve Replacement

Replace an existing backup generator, two influent valves and associated equipment for the existing WWTP. The Project shall take place during the summer of 2020.

Status

Bidding Closed

Prebid Date2/12/20 1:00 pm

Bid Date2/27/20 2:00 pm

Company & Contacts

HDR Engineering, Inc.

Andrew Staples - andrew.staples@hdrinc.com   509-343-8459

Location

Stevens Pass, WA

Project Estimate: $384,000 to $430,000

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A pre-bid conference for the Project will be held on February 12, 2020 at 1:00pm local time at Stevens Pass Sewer District WWTP. Bidders attending the pre-bid will need to meet at 1:00pm local time at the parking lot, west side of US Hwy 2, mile post 66.22, at the parking lot on the east side of the bridge. Stevens Pass staff will provide transportation from the parking area to the WWTP. Attendance at the pre-bid conference is encouraged but not required.