Post Street Bridge Replacement - 2017105 - ARI

This project consists of the construction of approximately 800 cubic yards of excavation and embankment, 370 linear feet of 60-inch sanitary sewer, 2 sanitary sewer diversion vaults (for live sewer diversion), 380 linear feet of storm sewer, 3 drainage structures, 1 stormwater lift station, 500 linear feet of storm sewer force main, 480 linear feet of 18- inch water main, 600 tons of HMA pavement, sundry utility adjustments, 17,700 square feet of bridge superstructure demolition and replacement and other related miscellaneous items.