Water and Sewer (Phase II) Improvements

Work shall include, but not be limited to, the following: A. Installation of approximately 13,900 lineal feet of new 6-inch to 12-inch diameter sewer pipelines throughout the City, including replacement of existing manholes and reconnection of existing side sewers. Existing sewers will be replaced by open-cut, pipe bursting, or cured-in-place pipe methods. B. Installation of approximately 5,200 lineal feet of new 8-inch diameter water main, including valves, fittings, hydrants, thrust blocks, services, service piping and all other appurtenances required to complete the work. C. Install an AMR water metering system, including furnishing and installing water meters, registers, and meter transmitter units at the locations shown in the Plans, providing documentation and pictures of each water meter installation, replacing water meter boxes and setters at the locations shown in the Plans, furnishing and installing hardware and software for the supplied AMR system, along with startup, testing, and operator training. D. Replacement of the source meters for the City’s wells with magnetic flow meters, including pipe, fittings, and all other appurtenances required to complete the work. E. Replacement of approximately 28 fire hydrants, including valves, fittings, thrust blocks, and all other appurtenances required to complete the work. F. Restoration of all surfaces disturbed by construction activities, including but not limited to, concrete curbs, gutters, driveways, sidewalks, gravel, landscaping, fencing, and HMA pavements. G. Provide testing, commissioning, and training as specified herein. H. All associated work as shown in the Contract Documents, for complete and workable system.

Status

Bidding Closed

Bid Date2/13/20 1:00 pm

Company & Contacts

Gray & Osborne, Inc.

Jamin Ankney - ankney@g-o.com   (509) 453-4833

Location

Soap Lake, WA

Project Estimate: $4,600,000 to $4,900,000

Bidders may download electronic files for a nominal fee of $15.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.