Mount Adams New K-8 School Replacement

1. Work includes demolition of existing site elements, new site work, paving (hard surface) revisions, and new building construction. The overall existing building area is approximately 103,000 square feet of new addition+ site work. 2. Construction elements include conventional reinforced cast-in-place concrete foundations, floor slabs, and wood and masonry construction. Site work elements are required to accommodate the new building construction work. 3. Exterior doors are Hollow Metal door/frame assemblies. Exterior glazing systems include aluminum windows and aluminum store front wall door/window systems. Exterior glazing is low-e tempered glass with solar bonze tint. 4. Interior building construction elements include gypsum board attached to wood or wood framing. Interior doors are solid core wood doors in hollow metal frames. 5. Interior finishes include painted walls and other surfaces, polished concrete, carpeting, walk-off carpeting, resilient flooring, ceramic tile walls, ceramic mosaic tile floors, gypsum boards soffits, and suspended acoustical ceilings. 6. Specialties, equipment and furnishings include marker boards, toilet accessories, cabinets and accessories, signs and miscellaneous specialties. 7. Mechanical work includes plumbing systems and fixtures, heating and air conditioning systems. Site mechanical work includes service piping and lines for water and sanitary sewer and fire sprinkler system. 8. Electrical work includes distribution systems, lighting fixtures, fire alarm work, data/phone work. 9. Site work includes plumbing storm drainage systems, water system, earthwork for new improvements, concrete walkways asphalt paving and landscape, irrigation work and fencing, accessories and the like.

Status

Accepting Bids

Prebid Date1/21/20 10:00 am

Bid Date2/13/20 4:00 pm

Company & Contacts

Loofburrow Wetch Architects

Jake Hartwig - jhartwig@loofburrow.com   (509) 457-5121

Location

Harrah, WA

Project Estimate: $27,000,000

Bidders may download electronic files for a nominal fee of $15.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A meeting for all parties interested in bidding on the Project will be held at the designated Office at Mt. Adams School District No. 209, 621 Signal Peak Road, White Swan, Washington at 10:00 A.M. on Tuesday, January 21, 2020.