18th & Kellogg Reservoir Replacement - Kennewick

This project includes, but is not limited to, construction of the following: · Demolition activities associated with relocating yard piping and removing existing fencing, trees and shrubs, paved pathways, sidewalks, curbs and gutters, sidewalks, and asphalt pavement. · Installation of a new 20 inch ductile iron pipe that connects with the existing 18 inch pump discharge pipeline (tie-in#1) and with the existing 24 inch pipe in South Irving Street (tie-in#2). Construction of a new 6.0 MG pre-stressed concrete reservoir that includes a mechanical mixer and underdrain collection system. · Construction of a new concrete and CMU pump building that includes vertical turbine pumps, chlorine generation and injection systems, surge tank system, mechanical HVAC, and associated electrical equipment. · Construction of yard structures including but not limited to buried concrete inlet, outlet/underdrain collection, suction valve, and metering vaults. · Installation of a 30 inch ductile iron offsite pipeline and tie-in at the existing 30 inch ductile iron pipe in South Irving Street (tie-in #3). · Installation of yard piping including but not limited to 30 inch ductile iron reservoir inlet and outlet pipes, 24 inch ductile iron pipe and tie-in at the existing 30-inch ductile iron pipe near the existing pump station (tie-in #4), 20 inch ductile iron pump discharge pipe that connects with the Zone 3 West Transmission Main (by others), Storm drain piping, smaller diameter yard piping and electrical conduits. · Site work including but not limited to construction of the site access road and fencing. Demolition of the existing 10 MG concrete and 0.5 MG steel reservoirs including all pipe connections. · Construction of the Stormwater Detention Basin and connecting it with the new site stormwater system and the existing Creekstone stormwater system. · Final site work including but not limited to final grading, landscaping and installation of irrigation systems.

Status

Accepting Bids

Prebid Date1/13/20 1:00 pm

Bid Date2/4/20 10:00 am

Company & Contacts

City of Kennewick

Kylie Peel kylie.peel@ci.kennewick.wa.us   (509) 585-4247

Location

Kennewick, WA

Project Estimate: $14,500,000.00

Bidders may download electronic files for a nominal fee of $15.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

1-13-2020 at 1pm: A non-mandatory pre-bid meeting will be held on January 13, 2020 at 1:00 P.M., at the project site (2204 S Irving St – Creekstone Park).