West Cashmere Bridge Replacement Project - Wenatchee

This Contract provides for the improvement of the West Cashmere Bridge by constructing a multi-span, continuous steel girder bridge; temporary work trestle; bridge demolition; excavation, handling, hauling and disposal of contaminated soils and man-made waste materials; drilled shafts; cast-in-place concrete deck; traffic and pedestrian barriers; pedestrian railing, sidewalk, and ramps; geosynthetic and retaining walls; roadway excavation including haul and HMA; traffic signal; illumination; storm sewer system; erosion control; planting; bird deterrent system; roadway and structure surveying; traffic control and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.

Status

Bidding Closed

Bid Date2/4/20 9:30 am

Company & Contacts

Chelan County

Kris Perry kristoffer.perry@co.chelan.wa.us   (509) 667-6415

Location

Wenatchee, WA

Bidders may download electronic files for a nominal fee of $15.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

Project Estimate: $15,000,000.00 – $20,000,000.00