WSU - Tri-Cities Wine Science Center Teaching Labs 204 & 206 - Richland

This is a two phased project of tenant improvements to build out existing shell spaces in Teaching Lab 206 and Prep Room 204 within the WSU Tri-Cities campus Wine Science Center Building, totaling 1,554 SF. This bid is for Phase 1 work ONLY and includes revisions and additions to existing mechanical and electrical systems up to the points of connection for future. Future Phase 2 work will include fixtures and equipment.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
Order files below, price will be calculated by SQFT
Name Size
01 - LS-001 - Life Science Lab - Cover Sheet 251.5 KB
02 - LS-101 - Life Science Lab - Floor Plan 341.4 KB
03 - LS-102 - Life Science Lab - Reflected Ceiling Plan 562.4 KB
04 - LS-103 - Life Science Lab - Floor Finish Plan 6.9 MB
05 - QL-001 - Life Science Lab -Schedules Abbrevications Notes and Casework Types 3.5 MB
06 - QL-201 - Life Science Lab -Laboratory Floor Plan Second Floor South 1.7 MB
07 - QL-301 - Life Science Lab -Laboratory Interior Elevations 1.8 MB
08 - QL-401 - Life Science Lab -Laboratory Details - Sections 2.0 MB
09 - E-001 - Symbols Legend, Abbreviations and Sheet Index 325.9 KB
10 - E-002 - General Electrical Notes 330.4 KB
11 - ED100 - Second Floor - Demo Plan 301.1 KB
12 - EL111 - Second Floor - Lighting Plan 604.0 KB
13 - EP111 - Second Floor - Power Plan 392.8 KB
14 - ET111 - Second Floor - Systems Plan 346.5 KB
15 - E-501 - Electrical Details 128.8 KB
16 - E-502 - Electrical Details 110.8 KB
17 - E-601 - One-Line Diagram 2.0 MB
18 - E-701 - Electrical Schedules 400.2 KB
19 - E-702 - Equipment Connection Schedule 142.9 KB
20 - M-101 - Life Science Lab Plumbing Plan 1.6 MB
21 - M-102 - Life Science Lab HVAC Plan 1.8 MB