Koch Well Pump Station Electrical Upgrades - Ritzville

The work generally consists of: Demolition of existing electrical and controls equipment in an existing well pumping station. Existing 200 HP, 750 GPM line shaft vertical turbine well pump to remain. Installation of an exterior electrical rack and new electrical equipment. Installation of a deep well pump control valve. Site work including installation of a chain link fence and a gravel driveway. Pumping system startup and testing. Other related items.

Status

Bidding Closed

Bid Date7/9/19 2:00 pm

Company & Contacts

Varela & Associates, INC.

Ben Varela va@varela-engr.com   (509) 328-6066

Location

Ritzville, WA

Bidders may download electronic files for a nominal fee of $15.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

Project Estimate: $177,005.00