Surprise Lake Middle School Project (Sub-Bids to Cornerstone General Contractors) - Milton

In general, the structure is concrete slab on grade, structural metal frame, metal joists with metal decking, rigid insulation and a single ply roof membrane. The exterior walls are constructed of metal stud framing, exterior gypsum sheathing with integrated air barrier, rigid insulation and veneer masonry or metal panels or CMU walls. Site work includes excavation, on-site drainage, paving, curbs, walks, site lighting, landscaping and irrigation system, as well as coordinated connections to existing sanitary sewer, water, power, gas, and telephone, provided by others.

Status

Bidding Closed

Bid Date7/9/19 2:00 pm

Company & Contacts

Cornerstone General Contractors, Inc.

Sam Comer sam@cornerstonegci.com   (425) 481-7460

Location

Milton, WA

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.