Howell Sewer Interceptor - ARI

The project consists of the construction of approximately 3,100 linear feet of 15-inch gravity sewer main installed at depths ranging from approximately 20 to 30 feet along McGuire Road and Poleline Avenue. The project includes a jack and bored casing and gravity main installation under the Union Pacific Railroad corridor, as well as gravity main installation within an existing casing under the Burlington Northern Santa Fe Railroad corridor. Following completion of the gravity main, the existing Howell Lift Station will be decommissioned. Additionally, the project includes the installation of approximately 200 linear feet of 6-inch, 8-inch, and 16-inch force mains under the Seltice Way corridor near Empire Center Boulevard. All work shall be in accordance with the contract documents.

Status

Accepting Bids

Bid Date7/23/19 1:00 pm

Company & Contacts

Welch Comer Engineers

Steve Cordes, scordes@welchcomer.com   (208) 664-9382

Location

Post Falls, ID

At the Owners request, Bidders may obtain the project and bid information from their plan room at www.welchcomerplanroom.com.

Plan Centers may download the project information from www.abadandistribution.com.