The project consists of furnishing all labor, materials, equipment, and other miscellaneous items to remove and replace trees; installation of new tree planters at existing trees; replace portions of the existing irrigation conduit and drip irrigation system; install new irrigation conduit and drip irrigation to existing trees; remove and re-set the existing paver stone sidewalk; and remove and replace concrete curb and gutter, concrete sidewalk, asphalt patch, and other miscellaneous items necessary to complete this project.

Status

Bidding Closed

Bid Date6/24/19 3:00 pm

Company & Contacts

City of Ellensburg

Ryan Lyyski, lyyskir@cityofellensburg.org   (509) 962-7230

Location

Ellensburg, WA

Bidders may download electronic files for a nominal fee of $15.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.