New Coeur d’Alene Elementary School - Coeur d' Alene - ARI

The work includes new building construction. The work listed below is not intended to cover every work item required by the contract documents; the General Contractor is responsible for all work indicated in those documents, whether listed here or not. a. The building construction includes, cast-in-place concrete, unit masonry, structural steel, steel stud framing systems, exterior and interior finish carpentry, foundation waterproofing, building insulation, sheet metal flashing and trim, new roofing systems, roof accessories, fire stopping systems, joint sealants, steel doors and frames, interior wood doors, sectional overhead doors, door hardware, glass, gypsum board, tiling, suspended ceiling systems, painting, building specialties, windows with integral blinds, manufactured casework, telescoping stands, fire sprinkler systems, HVAC and plumbing systems, electrical power, lighting and communication systems, as indicated on the Drawings and specified herein. b. The site construction includes site clearing, water, gas, electric and fire water services, grading, drainage control, site and building excavation and backfilling, concrete paving, asphalt paving, landscaping, irrigation, and other site improvements as indicated on the Drawings and specified herein.

Status

Bidding Closed

Bid Date7/2/19 5:00 pm

Company & Contacts

Architects West, Inc

Scott Fischer - scottf@architectswest.com   (208) 667-9402

Location

Coeur d'Alene, ID

At the Owners request, Bidders may obtain the project and bid information from their plan room at ‘www.architectswestplans.com’

Plan Centers may download the project information from ‘www.abadandistribution.com’