IDAHO PANHANDLE NATIONAL FOREST - Garnet Gulch Road & Panel Project - St. Maries

This project consists of reconstructing approximately 4200ft road. The existing road was originally pioneered but not completed. The work includes but is not limited to excavation and embankment, clearing and grubbing, culvert installation and replacement, aggregate surfacing (Item 32401 Additive Item), erosion control and dewatering. Garnet Panel Excavation: This aspect of the project consists excavation, haul, and stockpile garnet bearing gravel. The panel locations are within a riparian zone, as a result soft soils are anticipated. The involved will include but not limited to dewatering & erosion control, excavation and stockpile of topsoil, overburden, and garnet bearing gravel. The site will require special track mounted dump trucks to remove garnet bearing material from the riparian area. Swamp mats (Crane Mats) are a requirement of this contract to allow excavation equipment floatation on riparian soils. The Swamp mats will be government property upon completion of the project.

Status

Accepting Bids

Prebid Date6/20/19 12:00 pm

Bid Date7/8/19 4:00 pm

Company & Contacts

Forest Service

Alisha Knaub aknaub@fs.fed.us   (406) 495-3860

Location

Saint Maries, ID

Bidders may download electronic files for a nominal fee of $15.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

Project Estimate: $100,000.00 – $250,000.00

The SITE VISIT date has changed from June 19, 2019 at 12:00 pm to Thursday, June 20, 2019 at 12:00 pm. RSVP to Sean Christen at schristen@fs.fed.us no later than June 18, 2019. Interested quoters are encouraged to visit the project site prior to submittal of prices.