Well 18 Starter Replacement - Moses Lake

The work shall include replacement of the existing starter with a Variable Frequency Drive (VFD) in accordance with the plans and specifications. The work shall include installation of a split HVAC system, relocation of an existing electrical room heater, and all other work shown on the plans and included in the Special Provisions by RH2, which are included within the contract documents as Appendix A.

Status

Bidding Closed

Bid Date6/12/19 11:00 am

Company & Contacts

City of Moses Lake

Jerod Bradford jbradford@cityofml.com   (509) 764-3776

Location

Moses Lake, WA

Documents

Bidders may download electronic files for a nominal fee of $15.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

Project Estimate: $155,000.00