Columbia High School Roof Replacement - Burbank

The Project consists of the removal and replacement of approximately 15,600 square feet of existing single ply membrane roof system on three separate flat roofs. This will also entail replacement of damaged roof insulation, the removal and replacement of all metal coping, flashing and trim at parapets and at all mechanical units on the roof. New boots at vertical penetrations shall be provided even if not currently existing. New walk pads should also be provided to the units on the roof. Contractor shall be responsible for submitting the documents to the AHJ for approval.

Status

Bidding Closed

Prebid Date5/28/19 9:30 am

Bid Date6/5/19 3:00 pm

Company & Contacts

MMEC Architecture & Interiors

Flavien Sawadogo flavien@mmecarchitecture.com   (509) 396-7278

Location

Burbank, WA

Documents

Bidders may download electronic files for a nominal fee of $15.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

05/28 – Mandatory Pre-Bid Conference will be conducted Tuesday, May 28, 2019 at 9:30 am at Columbia High School, Burbank, WA. Check in with the front office.