MLC Riprap Scour Rehab - Walla Walla

The Corps of Engineers, Walla Walla District, proposes to repair a section of riprap that has eroded in the Mill Creek channel just downstream of the Mill Creek Diversion Dam (across from Rooks Park. A scour hole has developed in this area. The Contractor will be required to fill the scour hole with approximately 200 TON of placed, keyed-in, rip rap and other well graded stone that is Contractor provided. Although flows are expected to be low during the Construction period, the Contractor will need to divert water away from the construction area and may need to pump some water out of the hole to complete the work.
Date Company Contact
1558470707
5/21/19 1:31 pm
Downey Developments LLC Heidi Downey
Tel: 561-512-8784
1558470777
5/21/19 1:32 pm
Folkman Alan Folkman
Tel: (920) 544-9996
1558470817
5/21/19 1:33 pm
GCExperts Doug Reitmeyer
Tel: (512) 750-2677
1558470853
5/21/19 1:34 pm
Hawk Contracting Kristin Heim
Tel: (480) 247-8470
1559751909
6/5/19 9:25 am
Industrial Constructors, Inc. 8524 Gage, Suite A285
Kennewick, WA 99336
Don McMillin
President
Tel: 509-628-3335
Fax: 509-628-3362
1558470888
5/21/19 1:34 pm
MDM Mac Enterprises Denise McIntyre
Tel: (954) 325-7964
1558470940
5/21/19 1:35 pm
S.E.A. Construction LLC Joelle Buckman
Tel: (360) 589-6111
1558470981
5/21/19 1:36 pm
Stellar Phoenix Solutions Anisha Gupta
Tel: (609) 644-4800