George Washington Way Pavement Preservation - Richland

Construct approx 4.7 road miles of "mill and fill" on the George Washington Way between Guyer and Horn Rapids Road including planing existing asphalt, crack sealing, HMA surfacing, pavement markings, ADA ramp installation, sidewalk and curb replacement, traffic signal replacement, miscellaneous beautification and overall site restoration.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
Order files below, price will be calculated by SQFT
Name Size
01 - Cover and Table of Contents 630.3 KB
02 - Call for Bids 220.5 KB
03 - Vicinity Map 233.3 KB
04 - Proposal 813.0 KB
05 - Contract 442.0 KB
06 - Ammendments to the Standard Specifications 1.2 MB
07 - Special Provisions 2.0 MB
08 - Appendix A - Materials List 305.6 KB
09 - Appendix B - Wage Rates 4.8 MB
10 - Appendix C - Federal Wage Rates 751.5 KB
11 - Appendix D - Inadvertent Discovery Form 393.2 KB
12 - Appendix E - Federal Form 1273 612.6 KB
13 - Appendix F - Optional Grinding Haul Placement Location Map 2.4 MB
14 - Appendix G - Street Sign Table 188.5 KB