Blanchard Creek Road Culvert Replacement CRP No. 3229 - Spokane County

This work provides for the improvement of the Blanchard Creek Road located in Section 23 in Township 29 N. Range 45 E.W.M. by the removal of the existing culverts and the construction of a new structure over Blanchard Creek. The new structure is a single span framed with precast prestressed slabs supported by precast concrete abutments and reconstruction of the approach roadway. Included are; removal of structures and obstructions, structure excavation, Blanchard Creek Road Bridge No. 5905, rip rap, streambed gravel, CSBC, HMA and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Date Company Contact Bid Categories
1558384701
5/20/19 1:38 pm
Award Construction, Inc. 980 Willeys Lake Rd
Ferndale, WA 98248
Todd Vasey
Estimator
Tel: 360-318-8708
Fax: 360-318-8728
1. General Contractor
1559835221
6/6/19 8:33 am
NRC 1339 Commerce Avenue, Suite 309B
Longview, WA 98632
justin terry
Enviromental
Tel: 360 414-5239
2. Sub Contractor
1558107940
5/17/19 8:45 am
S&L Underground, Inc. 66304 Highway 2
PO Box 1952
Bonners Ferry, ID 83805
Shem Johnson
President
Tel: 208-267-7996
Fax: 208-267-8097