Central Corridor Project, Kootenai County Solid Waste - Coeur d'Alene

The completed Work will provide Owner with the Central Corridor landfill cell, which allows waste infill between the Original Landfill and East Landfill areas, as well as a new Commercial Entrance with platform scale for measuring incoming waste loads to the landfill. This new work consists of the following general construction elements: 1. Demolition of existing landfill gas and leachate utilities within the Central Corridor development area. 2. Removal of existing roadway materials within the Central Corridor and stockpiling those materials for County reuse. 3. Exposure of perimeter anchor trenches along the Original Cell and Cell E1 alignments for connection of Central Corridor bottom liner system. 4. Construction of the Central Corridor subgrade, bottom liner, and leachate collection systems. 5. Construction of perimeter road and drainage elements to support the Central Corridor. 6. Installation of new landfill gas collection piping. 7. Construction of new access roads at the Entrance Area. 8. Installation of a commercial scale and associated utilities at the Entrance Area.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
Order files below, price will be calculated by SQFT
Name Size
01 G-1 - Cover Sheet 135.6 KB
02 G-2 - Control Schedule Tables 1.1 MB
03 G-3 - Existing Site Conditions 2.0 MB
04 C-1 - Corridor Site Plan and Sediment & Erosion Control Plan 3.5 MB
05 C-2 - Entrance Site Plan and Sediment & Erosion Control Plan 2.0 MB
06 C-3 - Corridor Excavation Plan - South 1.9 MB
07 C-4 - Corridor Excavation Plan - North 2.0 MB
08 C-5 - Corridor Liner Layout and Leachate Pipingn Plan - South 1.8 MB
09 C-6 - Corridor Liner Layout and Leachate Piping Plan - North 1.9 MB
10 C-7 - Corridor Finished Grading Plan - South 2.0 MB
11 C-8 - Corridor Finished Grading Plan - North 2.1 MB
12 C-9 - Stormwater and Erosion Control Details 166.4 KB
13 C-10 - Corridor Sections and Details 184.9 KB
14 C-11 - Corridor Sections and Details 112.4 KB
15 C-12 - Corridor Sections and Details 116.1 KB
16 C-13 - Entrance Area Site Plan 2.1 MB
17 C-14 - Entrance Area Profile 157.2 KB
18 C-15 - Entrance Area Sections and Details 88.1 KB
19 E-1 - Legend 4.3 MB
20 E-2 - Abbreviations and General Notes 3.7 MB
21 E-3 - Overall Site Plan 5.4 MB
22 E-4 - One-Line Diagram, Panel Schedule, and Site Details 3.5 MB
23 E-5 - Site Details 2.4 MB
24 E-6 - Luminaire Schedule and Iecc 1.8 MB
25 LFG1 - North Lfg Plan 2.6 MB
26 LFG2 - South Lfg Plan 2.8 MB
27 LFG3 - Landfill Details 1.1 MB
28 LFG4 - Landfill Details 1.1 MB
29 LFG5 - Landfill Details 1.0 MB