Line Street Tunnel Lid Repair and Replacement, University of Idaho - Moscow

A description of the work of this project can be summarized to include the removal and replacement of a portion of the existing concrete steam tunnel at the intersection of Line Street and Sixth Street. Additional work includes, but not limited to, bituminous asphalt water proofing, removal and replacement of existing adjacent surfaces, including but not limited to, concrete walks, asphalt paving, landscape areas, excavation, backfill and reinstallation of adjacent surfaces to match existing.

Status

Bidding Closed

Prebid Date5/7/19 10:00 am

Bid Date5/16/19 2:00 pm

Company & Contacts

State of Idaho Division of Public Works

Kris Swanson   (208) 332-1900

Location

Moscow, ID

Documents

Project Estimate: $312,000.00

Bidders may download electronic files for a nominal fee of $15.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

There will be a Pre-Bid Conference on Tuesday, May 7, 2019, beginning at 10:00 am, prevailing local time, at the University of Idaho Facilities Center, Owyee Conference Room, 875 Perimeter Drive MS 2281, Moscow, 05/07/19 – Idaho. Bidders are encouraged to attend.