University of Idaho - Menard Law Building, Repair & Renovation of East Entry Steps & Planters

A description of the work of this project can be summarized to include removal of the existing concrete stairs, landing, and portion of planters on the east side of the Menard Law Building. New work includes installation of a new concrete plaza with paver accent, walkway, concrete stairs, handrails, guardrail, planters and pilasters with masonry veneer/accent and pre-cast caps. The work includes repointing deteriorated mortar joints, replacing deteriorated and missing mortar, repair and replacement of existing masonry. The work includes new benches, landscaping, irrigation, and replacement of two pedestrian light poles.

Status

Bidding Closed

Prebid Date4/30/19 10:00 am

Bid Date5/9/19 2:00 pm

Company & Contacts

SPVV Landscape Architects

Anne Hanenburg, anne@spvv.com   (509) 325-0511

Location

Moscow, ID

Documents

Project Estimate: $320,000

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

There will be a Pre-Bid Conference on Tuesday, April 30, 2019, beginning at 10:00 am, prevailing local time, at the Menard Law Building the meeting will start at UI Facilities, 875 Perimeter Drive – Seven Devils Conference Room, Moscow, Idaho. Bidders are encouraged to attend.