HD Fowler New Building - GC Select Project

Only those General Contractors selected by the owner, may bid this project. This project includes construction of a 18,2670 square foot construction materials distribution facility for the HD Fowler Company. The building will be include a two story office and sales area constructed using structural CMU, structural steel and wood framing. The warehouse portion will be constructed using a pre-engineered metal building. Scopes include: Earthwork, utilities, site concrete, gravel storage yard, asphalt paving, brick pavers, fencing, retaining wall, landscaping, building concrete, masonry, structural and misc steel, joist & deck, wood framing, custom cabinets and casework, solid surface counter tops, custom stainless steel counter top, insulation, membrane roofing, flashing and sheet metal, doors and hardware, aluminum windows, glass and glazing, stucco, drywall, acoustic, ceramic tile, vinyl flooring and carpet, painting, specialties and equipment, fire sprinkler system, plumbing, HVAC, electrical and fire alarm. Refer to the drawings and specifications for detailed information on any of the above.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover and Table of Contents 17.1 MB
02 - Division 00 - Procurement and Contracting Requirement 149.9 KB
03 - Division 01 - General Requirements 805.4 KB
04 - Division 03 - Concrete 84.4 KB
05 - Division 04 - Masonry 112.8 KB
06 - Division 05 - Metals 335.1 KB
07 - Division 06 - Wood, Plastics, and Composites 167.8 KB
08 - Division 07 - Thermal and Moisture Protection 277.7 KB
09 - Division 08 - Openings 547.2 KB
10 - Division 09 - Finishes 720.9 KB
11 - Division 10 - Specialties 159.1 KB
12 - Division 11 - Equipment 49.1 KB
13 - Division 12 - Furnishings 115.6 KB
14 - Division 13 - Special Construction 95.4 KB
15 - Division 21 - Fire Suppression 161.4 KB
16 - Division 22 - Plumbing 326.4 KB
17 - Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) 565.5 KB
18 - Division 26 - Electrical 398.1 KB
19 - Division 27 - Communications 97.7 KB
20 - Division 28 - Electronic Safety and Security 282.8 KB