City of Post Falls Water Reclamation Facility Outfall CMGC - ARI

The City desires to select a CMGC to provide pre-construction and construction services for a new Water Reclamation Facility (WRF) Outfall and discharge diffuser into the Spokane River. A reuse water pipeline and controls conduit will parallel the outfall and extend under the entire width of the river. The project will install the following components for the City of Post Falls Water Reclamation Facility: • New WRF Outfall Diffuser and Discharge Pipeline – This portion of the work consists of approximately 400 linear feet of pipeline (30-inch diameter pipe is anticipated) parallel to and upstream from the existing outfall. The work begins at Lundy Boulevard and continues south to the discharge point in the Spokane River (approximately 85 linear feet beyond the ordinary highwater mark). The existing outfall is expected to remain in place and in service during the construction of the new outfall line. Fittings and valves will connect the new and existing outfall pipeline allowing multiple points of discharge from the WRF. The size, type, final alignment, and diffuser arrangement will be determined through the design process. • New Reuse Pipeline – This portion of the work consists of approximately 700 linear feet of pipeline parallel to the new outfall line from Lundy Boulevard South beyond the ordinary high water mark on to the southern side of the Spokane River. The size, type, and number of pipelines crossing the river will be determined through the design process.

Status

Bidding Closed

Prebid Date11/15/18 1:00 pm

Bid Date12/11/18 2:00 pm

Company & Contacts

J-U-B Engineers

Chris Horgan, chorgan@jub.com   (208) 762-8787

Location

Post Falls, Northern ID

At the Owners request, Bidders may obtain the project and bid information from their plan room at ‘www.jubplanroom.com’

Plan Centers may download the project information from ‘www.abadandistribution.com’

A Non-Mandatory Pre-Proposal Meeting will be held 1:00 P.M. Local, Thursday, November 15, 2018 at the City’s Water Reclamation Facility conference room, located at 2002 W. Seltice Way, Post Falls, ID 83854. The meeting will consist of an overview of the Project including a review of the concept plans, Project goals, and known Project risks.