2018 Post Falls Water System Improvements - Post Falls

The City is currently replacing older undersized water lines to provide additional circulation for the city-owned water system in Post Falls, Idaho. This project entails the following upgrades to existing water mains: • Project P2 – William St. and 7th Ave.; upsize 4” pipe to 8” pipe in the alley between E. Seltice Way and E. 7th Ave., from N. Williams St. to the service of the building in the NE corner of the intersection of N. Spokane St. and E. 7th Ave. • Project P3 – Mullan Ave. and Spokane St.; upsize 4” pipe to 8” pipe in the North/South alley between N. Spokane St. and N. Frederick St. from the intersection of said alley and the East/West alley between E. Mullan Ave. and E Seltice Way to East Mullan Ave. continuing westerly to the intersection of N. Spokane St. and E Mullan Ave. • Project P4 – 9th Ave. and Spokane St.; install new 12” pipe from alley between W. 10th Ave. and W 9th Ave starting at its intersection with N. Spokane St. then crossing Spokane to the east side of N. Spokane Street. • Project P5 – Henry St. and 7th Ave.; upsize 2” pipe to 8” pipe in the alley between E Seltice Way and E. 7th Ave., from N. Williams St. to N. Henry St.. Install new 8” pipe from the end of the upsized 2” pipe in N. Henry St. extending southerly to alley between E. 7th Ave. and E 6th Ave. The projects also include replacement or reconnection of fire hydrants and services.
Date Company Contact Bid Categories
1542757923
11/20/18 3:52 pm
DW Excavating, Inc. PO Box 1089
Davenport, WA 99122
Lars Hendrickson
Estimator/PM
Tel: 509-919-7659
Fax: 509-241-0817
1. General Contractor
1543257007
11/26/18 10:30 am
LaRiviere Inc 17564 N. Dylan Ct
Rathdrum, ID 83858
Kim Sobota
Contract Admin.
Tel: 208-683-2646
Fax: 208-683-0793
1. General Contractor
1541096788
11/1/18 11:26 am
Stewart Contracting, Inc. PO Box 1275
Pinehurst, ID 83850
Greg Stewart
President
Tel: 208-682-9018
1. General Contractor