Upgrade HVAC, Sam Glenn Complex, Lewis-Clark State College - Lewiston

A description of the work of this project can be summarized to include: This project is to replace two existing mechanical roof-top units on the roof of the Sam Glenn Complex. The new mechanical system will consist of the following: · Three (3) VRF outdoor units located on the roof, piped together to function as a single unit that simultaneously serves the West and East center pods. · A control system interface to the existing Johnson Controls BAS to improve the LCSC staff’s operational awareness and enhance their remote troubleshooting ability. · WEST CENTER POD o Twenty-one (21) ductless VRF indoor units serving zones within the West center pod o A dedicated outside air system (DOAS), with energy recovery, providing ventilation from the roof curb and duct work formerly occupied by the existing multi-zone unit · EAST CENTER POD o Three (3) ducted VRF indoor units serving zones within the East center pod o An energy recovery ventilator (ERV) to provide ventilation. Scope of work includes the following: Division 0 - Procurement and Contracting Requirement, Division 1 - General Requirements, Division 2 - Existing Conditions, Division 7 - Thermal and Moisture Protection, Division 8 - Openings, Division 22 - Plumbing, Division 23 - Heating Ventilating and Air Conditioning (HVAC), Division 26 - Electrical.

Status

Accepting Bids

Prebid Date5/22/18 10:00 am

Bid Date5/31/18 10:00 am

Company & Contacts

Covenant Engineering

Rob Sawyer, Covenantengineering@cableone.net   208-792-1904

Location

Lewiston, Northern ID

Bidders may download electronic files for a nominal fee of $10.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A Pre-Bid Conference will be held in the SUB room 225, 500 8th Avenue, Lewiston, ID 83501 on May 22 starting at 10:00 AM local time. Bidders are encouraged to attend.