Quincy High School Conversion - ARI

The Work consists of a select demolition and renovation of (2) existing business labs into middle school science rooms; new resilient tile floors replacing existing at corridors and some classrooms, new resilient sheet goods over concrete at toilet rooms, installation of owner provided large monitor wall mounting brackets for Owner Furnished, Owner Installed monitors in classrooms; installation of new marker boards in classrooms and painting of walls & ceilings throughout. Alternate bid items include replacing existing light fixtures with new LED light fixtures and painting the building exterior. Scope of work includes the following: Division 0 - Procurement and Contracting Requirement, Division 1 - General Requirements, Division 2 - Existing Conditions, Division 3 - Concrete, Division 5 - Metals, Division 6 - Wood Plastics and Composites, Division 7 - Thermal and Moisture Protection, Division 8 - Openings, Division 9 - Finishes, Division 23 - Heating Ventilating and Air Conditioning (HVAC).


Accepting Bids

Prebid Date3/20/18 3:30 pm

Bid Date4/10/18 2:00 pm

Company & Contacts

NAC Architecture

Randy Wilson, rwilson@nacarchitecture.com   509-838-8240


Quincy, Eastern WA

At the Owners request, Bidders may obtain the project and bid information from their plan room at ‘www.nacplans.com’

Plan Centers may download the project information from ‘www.abadandistribution.com’