East GA Apron Rehabilitation

The project consists of, but is not limited to, the rehabilitation of the East General Aviation (GA) Apron (approximately 29,400 square yards) at the Yakima Air Terminal – McAllister Field, Yakima, WA, which includes removal of asphalt concrete pavement, removal of existing aircraft tiedowns, pavement milling/profiling, limited excavation, subgrade preparation; crushed aggregate base course, bituminous surfacing; electrical and lighting modifications to include apron lighting, installation of aircraft tiedowns, and striping.

Status

Bidding Closed

Prebid Date4/14/21 11:00 am

Bid Date4/23/21 11:00 am

Company & Contacts

J-U-B Engineers

Timothy D. Ike   (509) 458-3727

Location

Yakima, WA

Bidders may download electronic files for a fee. Printed documents are available, at Bidder’s expense, by choosing the “Order” option.

A non-mandatory pre-bid meeting will be held on April 14, 2021 at 11:00 A.M. local time for those interested contractors, subcontractors, and suppliers. Also, an onsite walk thru will be hosted by J-U-B ENGINEERS and Airport Staff at the conclusion of the pre-bid meeting.