McNeil Island Water System Replacement

Water System Replacement: a. Site preparation b. Construction of water treatment building c. Installation of water treatment equipment d. Installation of well pumps and drop pipe e. Connection of new water system to existing system f. Decommission of existing water treatment facility g. Reconfiguration of water treatment facility valves to outflow stormwater to Eden Creek.

Status

Accepting Bids

Prebid Date4/13/21 9:00 am

Bid Date4/27/21 3:00 pm

Company & Contacts

KPFF Consulting Engineers - Lacey

Ben Enfield   (360) 292-7230

Location

McNeil Island, WA

Project Estimate: $915,000 – $1,096,000

Bidders may download electronic files for a fee. Printed documents are available, at Bidder’s expense, by choosing the “Order” option.

MANDATORY Pre-Bid Meeting will be held on Tuesday, April 13, 2021 at 9:00 A.M. (and 11:00 A.M. if attendance requests are greater than 10.