Rose Street Bridge Replacement at Mill Creek

Work Includes the removal and replacement of the Rose Street Bridge at the intersection of Rose Street and 3rd Avenue. Work will also include, but not be limited to, micro pile foundation, concrete slab bridge construction, concrete sidewalk, ADA curb return ramps, curb, gutter, brick pavers, storm sewer main and laterals, hydrodynamic separators, water main, earthwork, grading, asphalt concrete paving, electrical, striping and signing.

Status

Bidding Closed

Bid Date4/12/21 2:00 pm

Company & Contacts

City of Walla Walla

Johnny LeMaster   (509) 527-4537

Location

Walla Walla, WA

Project Estimate: $4,125,000

Bidders may download electronic files for $20.00. Printed documents are available, at Bidder’s expense, by choosing the “Order” option.