WCC Reclaimed Water - Shelton

The Work will consist of construction of reclaimed water main pipe ranging in size from 1” to 8” in diameter across the WCC Campus, two trenchless undercrossings, connection of the reclaimed water main to irrigation system connection points, connection of the reclaimed water main to the boiler building including a backup potable water connection, connection of the reclaimed water main to the laundry facility including a backup potable water connection, a reclaimed water storage tank, a reclaimed water booster station, surface restoration for the pipeline, and all other work necessary to complete the project as defined in the contract plans and these specifications.

Status

Bidding Closed

Prebid Date2/18/21 10:00 am

Bid Date3/2/21 3:00 pm

Company & Contacts

Century West Engineering

Steve Nelson - snelson@centurywest.com   (509) 838-3810

Location

Shelton

Documents

Project Estimate: $1,025,000.00 to $1,395,000.00

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

NOTE: Please consult the Ad for Bid for additional information regarding the Pre-Bid and the Bid Opening.

A MANDATORY Pre-Bid onsite walk-through and conference is scheduled for 10:00 A.M. on Thursday, February 18, 2021, at the Washington Corrections Center, 2321 West Dayton Airport Road, Shelton, WA 98584.
TO BE CONSIDERED, PRIME BIDDERS ARE REQUIRED TO ATTEND.