East Valley School District Sports Fields - ARI

The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: Including but not limited to reconstruction of the school district baseball, softball, and football fields impacted by the extension of the future county road and city intersection project. Sport field specific work includes but is not limited to outfield fencing, infield dirt, bullpens, batting cages, backstops, dugouts, and storage buildings, scoreboard(s), pitching mounds, bases, foul poles, and installation of field goals. Site work includes but is not limited to the installation of asphalt paving for the parking lot, driveway access, pedestrian routes, concrete hardscape and sidewalks, fencing, flagpole, bleachers, and foul ball netting. Earthwork includes but is not limited to strip and stockpile existing topsoil, importation of topsoil, grading, and erosion control measures. Landscape work includes but is not limited to irrigation, seeding, sodding, landscape planting, landscape boulders, and mowstrips. Utility work includes but is not limited to electrical site needs and lighting, CXT building utility stub up and connection, sewer and water services, and sewer lift station. Includes other Work indicated in the Contract Documents.

Status

Bidding Closed

Prebid Date2/12/21 2:00 pm

Bid Date2/19/21 2:00 pm

Company & Contacts

Bernardo Wills Architects

Bill LaRue - blarue@bwarch.com   (509) 838-4511

Location

Spokane Valley

Project Documents are posted at  Bernardo Wills Plan Room