Wanapa Temporary Access Road

Construction of approximately 3,200 lineal feet of temporary gravel roadway. Consisting of 450 lineal feet of removal of fences, 11,422 cubic yards of embankment, 226 cubic yards of rock excavation, 4.6 cubic yards of boulder excavation, 153 lineal feet of 30 inch culvert pipe, 2 sloped end sections with trash racks, 2,432 tons of aggregate base, 3,608 tons of aggregate subbase, 674 tons of Level 3 ½ inch ACP mixture, 1.57 acres of permanent seeding, 0.05 acres of wetland seeding, one stop sign, an 18 inch steel pipe casing, and a 24 inch steel pipe casing.

Status

Bidding Closed

Prebid Date1/21/21 1:30 pm

Bid Date2/2/21 11:00 am

Company & Contacts

J-U-B Engineers

Tom Wallace   (541) 963-7100

Location

Umatilla, OR

Project Estimate: $750,000.00 to $1,250,000.00

Bidders may download electronic files for $10.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A voluntary Pre-Bid Conference will be convened Thursday January 21, 2021 at 1:30 p.m. at Umatilla City Hall, 700 6TH St |PO Box 130, Umatilla, OR 97882. Social Distancing and Face Masks will be required at all in-person meetings.