Arterial Streets Resurfacing 2020 (Re-Bid)

This project consists of resurfacing 1.27 miles of urban arterial streets by grinding and mixing the existing HMA and base rock, reshaping and compacting the base, roadway excavation/embankment, and paving with 5 inches of new HMA. Other project work includes reconstructing existing curb ramps according to ADA guidelines, traffic calming areas, and other related work.
No files available