The construction project consists of, but is not limited to, removal of existing temporary secondary feeder conductors, modifications to the existing overhead busway, installation of new underground secondary feeders, replacement of neutral bussing in the incoming circuit breaker switchgear and installation of medium voltage conductors. The electrical equipment is being repaired after a lightning event in May of 2020.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
Order files below, price will be calculated by SQFT
Name Size
COV - Cover 2.2 MB
E001 - Electrical Legend 3.1 MB
E002 - Electrical One-Line 2.2 MB
E003 - Existing Switchyard Demolition Plan 4.2 MB
E004 - Existing Electrical Equipment Demolition Plan 2.7 MB
E005 - Switchyard Plan 1.6 MB
E006 - Building Electrical Plan 1.8 MB
E007 - Details 2.4 MB
E008 - Electrical Conductor and Equipment Schedule 1.6 MB