Radar Pumping Plant Repairs

The construction project consists of, but is not limited to, removal of existing temporary secondary feeder conductors, modifications to the existing overhead busway, installation of new underground secondary feeders, replacement of neutral bussing in the incoming circuit breaker switchgear and installation of medium voltage conductors. The electrical equipment is being repaired after a lightning event in May of 2020.
No plan holders available for this job