Skagit Valley College - HVAC DDC System Upgrades

1. Knutzen Cardinal Center: Replacement of failing gas-fired makeup air handling unit serving the Cardinal Center kitchen. Provide direct digital controls (DDC) for makeup unit and connect to existing DDC system. Scope includes hazardous materials abatement, selective demolition, structural reinforcement and patching of existing roof membranes will occur at locations of new roof mounted equipment. Associated cutting, patching and restoration of finishes will occur at the locations of DDC controls work and along the pathways of control wiring. 2. Ford Hall: Replacement of existing pneumatic and electronic control systems in Ford Hall with a direct digital control (DDC) system and associated mechanical and electrical work. Scope also includes hazardous materials abatement, selective demolition, patching of existing roof membranes. Associated cutting, patching and restoration of finishes will occur at the locations of DDC controls work and along the pathways of control wiring. 3. Roberts Hall: Replacement of existing pneumatic and electronic control systems in Roberts Hall with a direct digital control (DDC) system. Install (2) Owner furnished, roof mounted air handling units serving the Campus Data Center. Provide a curtain system to create a cold aisle, including a releasing function for clean agent fire extinguishing system operation. Scope includes hazardous materials abatement, selective demolition, concrete saw cutting, structural reinforcement and patching of existing roof membranes will occur at locations of new roof mounted equipment. Associated cutting, patching and restoration of finishes will occur at the locations of new roof mounted equipment. Associated cutting, patching and restoration of finishes will occur at the locations of DDC controls work and along the pathways of control wiring.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
Order files below, price will be calculated by SQFT
Name Size
Division 00 - Procurement and Contracting Requirements 3.2 MB
Division 01 - General Requirements 5.1 MB
Division 02 - Existing Conditions 2.9 MB
Division 05 - Metals 68.8 KB
Division 06 - Wood, Plastics, and Composites 118.5 KB
Division 07 - Thermal and Moisture Protection 367.6 KB
Division 08 - Openings 53.6 KB
Division 09 - Finishes 405.9 KB
Division 13 - Special Construction 167.6 KB
Division 20 - General Mechanical 1.3 MB
Division 21 - Fire Suppression 98.4 KB
Division 22 - Plumbing 98.0 KB
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) 439.8 KB
Division 26 - Electrical 576.5 KB