Skagit Valley College - HVAC DDC System Upgrades

1. Knutzen Cardinal Center: Replacement of failing gas-fired makeup air handling unit serving the Cardinal Center kitchen. Provide direct digital controls (DDC) for makeup unit and connect to existing DDC system. Scope includes hazardous materials abatement, selective demolition, structural reinforcement and patching of existing roof membranes will occur at locations of new roof mounted equipment. Associated cutting, patching and restoration of finishes will occur at the locations of DDC controls work and along the pathways of control wiring. 2. Ford Hall: Replacement of existing pneumatic and electronic control systems in Ford Hall with a direct digital control (DDC) system and associated mechanical and electrical work. Scope also includes hazardous materials abatement, selective demolition, patching of existing roof membranes. Associated cutting, patching and restoration of finishes will occur at the locations of DDC controls work and along the pathways of control wiring. 3. Roberts Hall: Replacement of existing pneumatic and electronic control systems in Roberts Hall with a direct digital control (DDC) system. Install (2) Owner furnished, roof mounted air handling units serving the Campus Data Center. Provide a curtain system to create a cold aisle, including a releasing function for clean agent fire extinguishing system operation. Scope includes hazardous materials abatement, selective demolition, concrete saw cutting, structural reinforcement and patching of existing roof membranes will occur at locations of new roof mounted equipment. Associated cutting, patching and restoration of finishes will occur at the locations of new roof mounted equipment. Associated cutting, patching and restoration of finishes will occur at the locations of DDC controls work and along the pathways of control wiring.
  01 - Project Summary (click to expand/collapse)
Order this section, price will be calculated by SQFT
Order files below, price will be calculated by SQFT
Name Size
T001 - Project Summary 2.4 MB
  02 - Knutzen Cardinal Center (click to expand/collapse)
Order this section, price will be calculated by SQFT
Order files below, price will be calculated by SQFT
Name Size
01 - G001A - Cover Sheet 2.7 MB
02 - G002A - Life Safety Diagrams 1.9 MB
03 - A101A - Site Plan 1.2 MB
04 - A201A - Roof Plan & Reflected Ceiling Plan 1.7 MB
05 - S100 - Structural Notes 395.0 KB
06 - S200 - Structural Plans & Details 307.5 KB
07 - M0.01A - Legend and Abbreviations 3.8 MB
08 - M0.02A - General Notes 2.4 MB
09 - MD2.01A - Roof and Main Floor Demolition Mechanical Plan 1.8 MB
10 - M2.01A - Roof and Main Floor Mechanical Plan 1.6 MB
11 - M4.01A - Mechanical Sections 758.6 KB
12 - M5.01A - Mechanical Details & Diagrams 1.4 MB
13 - M6.01A - Mechanical Schedules 1.4 MB
14 - E0.01A - Legend, Abbreviations, and General Notes 2.4 MB
15 - E1.01A - Roof and Main Floor Electrical Plan - Demo 1.0 MB
16 - E2.01A - Roof and Main Floor Electrical Plan 1.0 MB
17 - E6.01A - Panel Schedules 1.1 MB
18 - HM100A - Hazardous Material Plan 1.4 MB
  03 - Ford Hall (click to expand/collapse)
Order this section, price will be calculated by SQFT
Order files below, price will be calculated by SQFT
Name Size
01 - G001B - Cover Sheet 2.4 MB
02 - G002B - Life Safety Diagrams 2.7 MB
03 - A101B - Site Plan 1.4 MB
04 - A201B - Level 1 Floor Plan 1.5 MB
05 - A202B - Level 2 Floor Plan 1.7 MB
06 - A203B - Roof Plan 2.4 MB
07 - A210B - Level 1 Reflected Ceiling Plan 1.8 MB
08 - A211B - Level 2 Reflected Ceiling Plan 1.6 MB
09 - M0.01B - Legend and Abbreviations 3.9 MB
10 - M0.02B - General Notes 2.6 MB
11 - MD2.01B - Mechanical Level 1 Demolition Plan 1.5 MB
12 - MD2.02B - Mechanical Level 2 Demolition Plan 2.1 MB
13 - MD2.03B - Mechanical Roof Demolition Plan 2.5 MB
14 - M2.01B - Mechanical Level 1 Plan 1.9 MB
15 - M2.02B - Mechanical Level 2 Plan 2.1 MB
16 - M2.03B - Mechanical Roof Plan 2.7 MB
17 - M5.012B - Mechanical Details 3.7 MB
18 - M5.02B - Mechanical Details & Diagrams Sheet 2 3.2 MB
19 - E0.01B - Legend, Abbreviations, and General Notes 2.6 MB
20 - E2.01B - Electrical Level 1 Plan 1.2 MB
  05 - Roberts Hall (click to expand/collapse)
Order this section, price will be calculated by SQFT
Order files below, price will be calculated by SQFT
Name Size
01 - G001C - Cover Sheet 3.0 MB
02 - G002C - Life Safety Diagrams 2.4 MB
03 - A101C - Site Plan 1.1 MB
04 - A200C - Basement & Tunnel Floor Plan 937.2 KB
05 - A201C - Main Floor Plan 1.3 MB
06 - A202C - Balcony & Penthouse Floor Plan 1.2 MB
07 - A210C - Reflected Ceiling Plan 1.9 MB
08 - A601C - Data Center Enlarged Plans & Elevations 1.9 MB
09 - A602C - Data Center Details 1.4 MB
10 - M0.01C - Legend and Abbreviations 3.9 MB
11 - M0.02C - General Notes 2.6 MB
12 - MD2.01C - Basement and Tunnel Mechanical Demolition Plan 946.6 KB
13 - MD2.02C - First Floor Mechanical Demolition Plan 1.4 MB
14 - MD2.03C - Balcony - Penthouse Mechanical Demolition Plan 1.6 MB
15 - MD3.01C - Mechanical Data Center Floor Plan 1.0 MB
16 - M2.01C - Basement and Tunnel Mechanical Plan 1.1 MB
17 - M2.02C - Main Floor Mechanical Plan 1.5 MB
18 - M2.03C - Balcony - Penthouse Mechanical Plan 1.9 MB
19 - M3.01C - Mechanical Partial Plans 1.7 MB
20 - M4.01C - Mechanical Sections 972.2 KB
21 - M5.01C - Mechanical Details - Diagrams Sheet 1 4.1 MB
22 - M5.02C - Mechanical Details - Diagrams Sheet 2 2.7 MB
23 - M5.03C - Mechanical Details - Diagrams Sheet 3 2.7 MB
24 - M5.04C - Mechanical Details - Diagrams Sheet 4 3.3 MB
25 - M6.01C - Mechanical Schedules 1.8 MB
26 - F3.01C - Fire Protection Partial Plan 1.1 MB
27 - E0.01C - Legend, Abbreviations, and General Notes 2.4 MB
28 - E2.02C - First Floor Electrical Plan 1.4 MB
29 - E2.03C - Balcony - Penthouse Electrical Plan 1.1 MB
30 - E6.01C - Panel Schedules 2.2 MB
31 - HM100C - Basement & Tunnel Hazardous Material Plan 1.0 MB
32 - HM101C - Balcony & Penthouse Hazardous Material Plan 1.2 MB