Juvenile Detention Addition

The work consists of a two story 4,236 sf Type III-N Concrete masonry structure addition to an existing Juvenile Detention Center. The masonry will be clad with an insulated synthetic stucco (EIFS) system. A 171 sf entry canopy and a remodel of approximately 1,100 sf of the existing detention center, although certain trades will need access to other areas of the facility. The existing juvenile detention center will remain in operation during construction. The project will require expansion of the existing fire sprinkler system.

Status

Bidding Closed

Prebid Date10/29/20 2:00 pm

Bid Date11/12/20 11:00 am

Company & Contacts

Brotnov Architecture & Planning

Jerry Brotnov   (509) 758-2512

Location

Lewiston, ID

Bidders may download electronic files for $10.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A mandatory pre-bid conference will be held at this location for contractors and subcontractors on the October 29, 2020 at 2:00 pm.