GEG EDS Machine Replacement Project - 1744-1908

The Work includes providing, modifying and installing new conveyor and associated controls equipment to support the recapitalization of the existing EDS screening machines throughout Concourse A&B, and C (5 total machines). This includes providing temporary portering of checked baggage during modifications to the systems. Checked Baggage Screening Area will remain in operation during construction to neighboring systems. Concourse C requires a temporary Checked Baggage Screening Area in the lobby, included as part of scope of work.

Status

Accepting Bids

Prebid Date10/14/20 2:00 pm

Bid Date11/10/20 2:00 pm

Company & Contacts

Spokane International Airport

Lisa Corcoran
lcorcoran@spokaneairports.net  
(509) 455-6406

Location

Spokane, WA

Project Estimate: $600,000 – $650,000

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A MANDATORY Pre-Bid Conference will be held in the Airport Event Center of the Spokane International Airport at 2:00 p.m. PST, October 14, 2020. The Pre-Bid Conference will be hosted onsite as well as virtually. Major subcontractors are encouraged to attend either onsite or virtually; however, attendance (in person or virtual) is mandatory for the Prime Contractors only. Please limit attendance to one person per firm. Pursuant to Washington State Department of Health Order 20-03, it is mandatory to wear facial coverings when inside the Spokane International Airport terminal and other airport public areas. Bid Proposals submitted by a contractor, which did not attend this pre-bid conference, will be rejected.