ESH - Eastlake: Door & Hardware Replacement

Work of the Contract can be summarized as follows: Replace various doors and hardware. Work consists of, but is not limited to, removing doors and replacing with new doors and hardware and removing some interior door/frame assemblies and providing large door/frame assemblies. Associated work consists of, but is not limited to, light gauge metal framing, gypsum board assemblies, painting, flooring, resilient base, electrical lighting (switch) relocation at doors with larger frames, and miscellaneous other work associated with replacement.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
Order files below, price will be calculated by SQFT
Name Size
01 - Cover, Signature Page and Table of Contents 307.2 KB
02 - Division 00 - Procurement and Contracting Requirements 3.8 MB
03 - Division 01 - General Requirements 1.1 MB
04 - Division 06 - Wood, Plastics, and Composites 122.2 KB
05 - Division 07 - Thermal and Moisture Protection 198.2 KB
06 - Division 08 - Openings 492.6 KB
07 - Division 09 - Finishes 241.2 KB