Lakeland Village Utility Replacement

The Work comprises the removal and installation of steam piping, condensate piping, water piping, electrical conduit, associated valves, piping accessories, insulation, excavation/backfill (for site piping), concrete patching, and connections to existing piping systems.

Status

Accepting Bids

Bid Date8/20/20 3:00 pm

Company & Contacts

Century West Engineering

Steve Nelson
snelson@centurywest.com   (509) 838-3810

Location

Medical Lake, WA

Project Estimate: $530,000.00 to $580,000.00

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

PRE-BID WALK-THROUGH: August 12, 2020. For specific directions for an on-site pre-bid walk-through, please contact the Consultant.