AHCC Reclaimed Water Implementation

The Work will consist of construction of reclaimed water main pipe ranging in size from 1” to 8” in diameter across the AHCC Campus, two trenchless undercrossings, connection of the reclaimed water main to 6 irrigation system connection points, connection of the reclaimed water main to the boiler building including a backup potable water connection, connection of the reclaimed water main to the laundry facility including a backup potable water connection, surface restoration for the pipeline, and all other work necessary to complete the project as defined in the contract plans and these specifications.

Status

Bidding Closed

Prebid Date8/6/20 10:00 am

Bid Date8/13/20 3:00 pm

Company & Contacts

Century West Engineering

Matt Morkert mmorkert@centurywest.com   (509) 838-3810

Location

Airway Heights, WA

Project Estimate: $1,100,000 to $1,300,000

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

PRE-BID WALK-THROUGH: 10:00 A.M., Thursday, August 6, 2020, at the Airway Heights Corrections Center, Building A3, maintenance conference room.