Roof Replacement & Leak Repair - Transportation Bldg.

1. Removal of the existing PVC membrane roofing system together with tapered insulation and fiber coverboard, associated flashing and terminations at portions of the Transportation Building as indicated on plans followed by installation of new fully adhered thermoplastic membrane roofing system over new tapered insulation together with associated flashing & terminations and fall protection. 2. Removal of identified horizontal and vertical joint sealant in the exterior envelope of the building and replacement with new (Alternate #1).

Status

Bidding Closed

Bid Date7/30/20 3:00 pm

Company & Contacts

Schreiber Starling Whitehead

Jonas Hallstrom   (206) 682-8300

Location

Olympia, WA

Project Estimate: $650,000 to $730,000

Bidders may download electronic files for $10.00. Printed documents are available, at Bidder’s expense, by choosing the “Order” option.