Centralia College - Multiple Buildings Roof Replacement & Repair
Provide the labor and materials to remove and replace existing roofing on all or portions of roofs on Hanson Hall, Michael Smith Gymnasium, and Washington Hall. Work on Hanson Hall also includes removal of the existing packaged rooftop heat pumps and installation of new Variable Refrigerant Flow (VRF) system, and rooftop-mounted Dedicated Outside Air System (DOAS) unit, and related modifications.
Specifications
(click to expand/collapse)

Name | Size | ||
Division 00 - Procurement and Contracting Requirements | 3.4 MB | ||
Division 01 - General Requirements | 479.7 KB | ||
Division 02 - Existing Conditions | 1.9 MB | ||
Division 05 - Metals | 260.1 KB | ||
Division 06 - Wood, Plastics, and Composites | 72.3 KB | ||
Division 07 - Thermal and Moisture Protection | 363.2 KB | ||
Division 09 - Finishes | 28.6 KB | ||
Division 20 - General Mechanical | 413.6 KB | ||
Division 22 - Plumbing | 65.5 KB | ||
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) | 251.2 KB | ||
Division 26 - Electrical | 108.1 KB |