CBCC Lift Station Pump Replacement

Lift Station Pump Replacement: a. Bypass installation. b. Removal of existing pumps, wetwell lid, and pipes in wetwell. c. Removal of force main adjacent to wetwell as required for vault installation. d. Installation of storm catch basin, storm culvert. e. Install new concrete lid and access hatch on existing wetwell. f. Install improvements in existing wetwell including pipe and submersible pumps. g. Install valve vault and force main between wet well and existing force main. h. Install pump control and electrical improvements in wetwell and adjacent building. i. Remove Bypass.

Status

Bidding Closed

Prebid Date7/29/20 11:00 am

Bid Date8/13/20 3:00 pm

Company & Contacts

KPFF Consulting Engineers

Clinton D. Pierpoint   (360) 292-7230

Location

Clallam Bay, WA

Project Estimate: $435,500 to $503,500

Bidders may download electronic files for $10.00. Printed documents are available, at Bidder’s expense, by choosing the “Order” option.

A pre-bid walk-through will be held on, Wednesday, July 29, 2020, at 11:00 A.M. and 1:00 P.M., if attendance request is greater than 10.